Eilean Donan Visitor Centre Lean-To

The client chose to work with Novar Sawmill as we could provide them with a bespoke timber frame using locally grown Douglas Fir which reflected their sustainability values.

The 18m length of the lean-to was constructed using 6m long beams connected by scarf joints.

The precision pre-cut and pre-drilled components resulted in significant labour saving as the timber frame was erected in just two days.